Home » Code-based seismic design » Malaysia » Program MY1a – MS EC8 NA response spectrum generator (Imai-Tonouchi All Soil)

Program MY1a – MS EC8 NA response spectrum generator (Imai-Tonouchi All Soil)

QUAKE ADVICE_Seismic Elastic Response Spectrum Report

Determination of Seismic Elastic Response Spectrum Based on Imai & Tonouchi All Soil Model

1. Input Parameters:


'Imai & Tonouchi All Soil Model' requires information of the thickness, and SPT-N for soil layers in each Borehole.

I. Location of Site:
II. Importance Class of Structure:
III. PGA on rock (g):
IV. Thickness and SPT-N Values of each Borehole:
Note:
  1. D1, D2 ..D20 refer to column nos. 1-20 for inputting the thicknesses (m) of the soil layers whereas N1, N2 ..N20 refer to the input of the SPT-N (blows/300 mm) values.
  2. Table can be filled manually or by performing copy (CTRL+C) and paste (CTRL+V) of data from Excel spreadsheet.
  3. If all entries to a particular “thickness” column have been left blank, the program will automatically fill in a default thickness of 1.5 m.
  4. SPT-N values that have been taken from the testing of very stiff materials have to be corrected to the penetration depth of 300 mm. For example, an SPT-N value of 50 for the penetration depth of 100 mm should be corrected to 150.
  5. Avoid including too many borelogs from too closely spaced boreholes into one analysis as doing this would not necessarily result in obtaining an accurate estimate of the site period. The Malaysian EC8 NA recommends that the spacing of boreholes to be included into site classification analyses be spaced at 15 m - 45 m.
  6. Must also avoid including borelogs taken from a very large area featuring systematic spatial variation in geology within the area. The maximum number of borelogs to be included into one analysis is capped at 20.

Borehole 1 Borehole 2 Borehole 3 Borehole 4 Borehole 5 Borehole 6 Borehole 7 Borehole 8 Borehole 9 Borehole 10 Borehole 11 Borehole 12 Borehole 13 Borehole 14 Borehole 15 Borehole 16 Borehole 17 Borehole 18 Borehole 19 Borehole 20
D1 N1 D2 N2 D3 N3 D4 N4 D5 N5 D6 N6 D7 N7 D8 N8 D9 N9 D10 N10 D11 N11 D12 N12 D13 N13 D14 N14 D15 N15 D16 N16 D17 N17 D18 N18 D19 N19 D20 N20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40


V. Energy Ratio (N60/Nmeasured):

Note: Energy ratio is the conversion factor for converting the measured N values to corrected N values corresponding to 60% energy efficiency. A value of 1 is suggested for the case of Malaysia (Sabatini et al., 2002).